A two-level scheduler to dynamically schedule a stream of batch jobs in large-scale Grids (Abstract/Poster in atti di convegno)

Type
Label
  • A two-level scheduler to dynamically schedule a stream of batch jobs in large-scale Grids (Abstract/Poster in atti di convegno) (literal)
Anno
  • 2008-01-01T00:00:00+01:00 (literal)
Http://www.cnr.it/ontology/cnr/pubblicazioni.owl#doi
  • 10.1145/1383422.1383460 (literal)
Alternative label
  • Baraglia R.; Pasquali M.; Capannini G.; Laforenza D.; Ricci L. (2008)
    A two-level scheduler to dynamically schedule a stream of batch jobs in large-scale Grids
    in High Performance Distributed Computing, Boston, USA, June 23-27, 2008
    (literal)
Http://www.cnr.it/ontology/cnr/pubblicazioni.owl#autori
  • Baraglia R.; Pasquali M.; Capannini G.; Laforenza D.; Ricci L. (literal)
Pagina inizio
  • 231 (literal)
Pagina fine
  • 232 (literal)
Http://www.cnr.it/ontology/cnr/pubblicazioni.owl#url
  • http://dl.acm.org/citation.cfm?id=1383460 (literal)
Http://www.cnr.it/ontology/cnr/pubblicazioni.owl#titoloVolume
  • Proceeding HPDC '08 Proceedings of the 17th international symposium on High performance distributed computing (literal)
Http://www.cnr.it/ontology/cnr/pubblicazioni.owl#note
  • In: HPDC 2008 - High Performance Distributed Computing (Boston, USA, June 23-27, 2008, 23-27 Giugno 2008). Abstract, pp. 231 - 232. (ACM Special Interest Group on Computer Architecture). ACM, 2008. (literal)
Http://www.cnr.it/ontology/cnr/pubblicazioni.owl#pagineTotali
  • 2 (literal)
Http://www.cnr.it/ontology/cnr/pubblicazioni.owl#descrizioneSinteticaDelProdotto
  • This paper describes the study conducted to design and eval- uate a two-level on-line scheduler to dynamically schedule a stream of sequential and multi-threaded batch jobs on large- scale grids, made up of interconnected clusters of heteroge- neous machines. The scheduler aims to schedule arriving jobs respecting their computational and deadline require- ments, and optimizing the utilization of hardware resources as well as software resources. (literal)
Note
  • Poster (literal)
Http://www.cnr.it/ontology/cnr/pubblicazioni.owl#affiliazioni
  • CNR-ISTI, Pisa, CNR-ISTI, Pisa - Department of Computer Science, Univ. Pisa (literal)
Titolo
  • A two-level scheduler to dynamically schedule a stream of batch jobs in large-scale Grids (literal)
Http://www.cnr.it/ontology/cnr/pubblicazioni.owl#isbn
  • 978-1-59593-997-5 (literal)
Abstract
  • This paper describes the study conducted to design and evaluate a two-level on-line scheduler to dynamically schedule a stream of sequential and multi-threaded batch jobs on largescale grids, made up of interconnected clusters of heterogeneous machines. The scheduler aims to schedule arriving jobs respecting their computational and deadline requirements, and optimizing the utilization of hardware resources as well as software resources. (literal)
Prodotto di
Autore CNR
Insieme di parole chiave

Incoming links:


Autore CNR di
Prodotto
Insieme di parole chiave di
data.CNR.it