The ITER neutral beam test facility: Designs of the general infrastructure, cryosystem and cooling plant (Articolo in rivista)

Type
Label
  • The ITER neutral beam test facility: Designs of the general infrastructure, cryosystem and cooling plant (Articolo in rivista) (literal)
Anno
  • 2005-01-01T00:00:00+01:00 (literal)
Http://www.cnr.it/ontology/cnr/pubblicazioni.owl#doi
  • 10.1016/j.fusengdes.2005.06.114 (literal)
Alternative label
  • J.J. Cordier; R. Hemsworth ; M. Chantant; B. Gravil; D. Henry; F. Sabathier; L. Doceul; E. Thomas; D. van Houtte; P. Zaccaria; V. Antoni; S. Dal Bello; D. Marcuzzi; A. Antipenkov; C. Day; M. Dremel; P.L. Mondino (2005)
    The ITER neutral beam test facility: Designs of the general infrastructure, cryosystem and cooling plant
    in Fusion engineering and design; North Holland Pub. Co., Amsterdam (Paesi Bassi)
    (literal)
Http://www.cnr.it/ontology/cnr/pubblicazioni.owl#autori
  • J.J. Cordier; R. Hemsworth ; M. Chantant; B. Gravil; D. Henry; F. Sabathier; L. Doceul; E. Thomas; D. van Houtte; P. Zaccaria; V. Antoni; S. Dal Bello; D. Marcuzzi; A. Antipenkov; C. Day; M. Dremel; P.L. Mondino (literal)
Pagina inizio
  • 397 (literal)
Pagina fine
  • 402 (literal)
Http://www.cnr.it/ontology/cnr/pubblicazioni.owl#url
  • http://www.sciencedirect.com/science/article/pii/S0920379605002437 (literal)
Http://www.cnr.it/ontology/cnr/pubblicazioni.owl#numeroVolume
  • 74 (literal)
Rivista
Http://www.cnr.it/ontology/cnr/pubblicazioni.owl#note
  • Special Issue (literal)
Http://www.cnr.it/ontology/cnr/pubblicazioni.owl#pagineTotali
  • 6 (literal)
Note
  • Scopu (literal)
  • ISI Web of Science (WOS) (literal)
Http://www.cnr.it/ontology/cnr/pubblicazioni.owl#affiliazioni
  • 1-9 : Association EURATOM-CEA, DSM, D´epartement Recherche Fusion Contr^ol´ee, CEA/Cadarache, bat 506, F-13108 Saint Paul Lez Durance Cedex, France / 10-13 : CONSORZIO RFX Association EURATOM-ENEA, Corso Stati Uniti 4, I-35127 Padova, Italy / 14-16 : FZK, Institut f¨ur Technische Physik, Karlsruhe 76021, Germany / 17 : EFDA CSU, Max-Planck-Institut f¨ur Plasma Physik Boltzmannstr. 2, D-85748 Garching, Germany (literal)
Titolo
  • The ITER neutral beam test facility: Designs of the general infrastructure, cryosystem and cooling plant (literal)
Abstract
  • European Research Centers and Associations as ENEA, FZK, IPP, UKAEA and CEA are involved in the design of the first ITER neutral beam (NB) injector and the ITER neutral beam test facility. A total power of about 50MW will have to be removed in steady state on the neutral beam test facility (NBTF). The main purpose of this task is to make progress with the detailed design of the first ITER NB injector and to start the conceptual design of the ITER NBTF. The general infrastructure layout of a generic site for the NBTF includes the test facility itself equipped with a dedicated beamline vessel and integration studies of associated auxiliaries such as cooling plant, cryoplant and forepumping system. (literal)
Editore
Prodotto di
Autore CNR
Insieme di parole chiave

Incoming links:


Autore CNR di
Prodotto
Http://www.cnr.it/ontology/cnr/pubblicazioni.owl#rivistaDi
Editore di
Insieme di parole chiave di
data.CNR.it