http://www.cnr.it/ontology/cnr/individuo/prodotto/ID26203
Maintenance Schemes for the ITER Neutral Beam Test Facility (Articolo in rivista)
- Type
- Label
- Maintenance Schemes for the ITER Neutral Beam Test Facility (Articolo in rivista) (literal)
- Anno
- 2005-01-01T00:00:00+01:00 (literal)
- Http://www.cnr.it/ontology/cnr/pubblicazioni.owl#doi
- 10.1016/j.fusengdes.2005.06.218 (literal)
- Alternative label
P. Zaccaria; S. Dal Bello; D. Marcuzzi ; A. Masiello ; J.J. Cordier; R. Hemsworth ; A. Antipenkov; C. Day; M. Dremel; A. Mack; T. Jones;
A. Coniglio; M. Pillon; S. Sandri; E. Speth; A. Tanga , V. Antoni ; E. Di Pietro; P.L. Mondino (2005)
Maintenance Schemes for the ITER Neutral Beam Test Facility
in Fusion engineering and design; North Holland Pub. Co., Amsterdam (Paesi Bassi)
(literal)
- Http://www.cnr.it/ontology/cnr/pubblicazioni.owl#autori
- P. Zaccaria; S. Dal Bello; D. Marcuzzi ; A. Masiello ; J.J. Cordier; R. Hemsworth ; A. Antipenkov; C. Day; M. Dremel; A. Mack; T. Jones;
A. Coniglio; M. Pillon; S. Sandri; E. Speth; A. Tanga , V. Antoni ; E. Di Pietro; P.L. Mondino (literal)
- Pagina inizio
- Pagina fine
- Http://www.cnr.it/ontology/cnr/pubblicazioni.owl#url
- http://www.sciencedirect.com/science/article/pii/S092037960500089X (literal)
- Http://www.cnr.it/ontology/cnr/pubblicazioni.owl#numeroVolume
- Rivista
- Http://www.cnr.it/ontology/cnr/pubblicazioni.owl#note
- Http://www.cnr.it/ontology/cnr/pubblicazioni.owl#pagineTotali
- Note
- Scopu (literal)
- ISI Web of Science (WOS) (literal)
- Http://www.cnr.it/ontology/cnr/pubblicazioni.owl#affiliazioni
- 1-4,12,17 : Consorzio RFX, Association EURATOM-ENEA, I-35127 Padova, Italy /
5,6 : Association EURATOM-CEA, DSM/D´epartement Recherche Fusion Contr^ol´ee, CEA/Cadarache, F-13108 Saint Paul Lez Durance Cedex, France /
7-10 : Forschungszentrum Karlsruhe, Institut f¨ur Technische Physik, 76021 Karlsruhe, Germany /
13,14 : ENEA, Centro Ricerche Frascati, I-00044 Frascati, Rome, Italy /
15,16 : IPP CSU-Max-Planck-Institut f¨ur Plasma Physik, D-85748 Garching, Germany /
11 : UKAEA Culham EURATOM/UKAEA Fusion Association Culham Science Centre, Abingdon OX14 3DB, UK /
18,19 : EFDA CSU, D-85748 Garching, Germany (literal)
- Titolo
- Maintenance Schemes for the ITER Neutral Beam Test Facility (literal)
- Abstract
- The ITER neutral beam test facility (NBTF) is planned to be built, after the approval of the ITER construction and the choice
of the ITER site, with the agreement of the ITER international team and of the JA and RF participant teams. The key purpose is
to progressively increase the performance of the first ITER injector and to demonstrate its reliability at the maximum operation
parameters: power delivered to the plasma 16.5MW, beam energy 1MeV, accelerated D- ion current 40 A, pulse length 3600 s.
Several interventions for possible modifications and for maintenance are expected during the early operation of the ITER
injector in order to optimise the beam generation, aiming and steering. The maintenance scheme and the related design solutions
are therefore a very important aspect to be considered for the NBTF design.
The paper describes consistently the many interrelated aspects of the design, such as the optimisation of the vessel and
cryopump geometry, in order to get a better maintenance flexibility, an easier man access and a larger access for diagnostic and
monitoring. (literal)
- Editore
- Prodotto di
- Autore CNR
- Insieme di parole chiave
Incoming links:
- Autore CNR di
- Prodotto
- Http://www.cnr.it/ontology/cnr/pubblicazioni.owl#rivistaDi
- Editore di
- Insieme di parole chiave di