http://www.cnr.it/ontology/cnr/individuo/prodotto/ID25966
Preliminary design of the control and data acquisition systems for the Neutral Beam Test Facility (Articolo in rivista)
- Type
- Label
- Preliminary design of the control and data acquisition systems for the Neutral Beam Test Facility (Articolo in rivista) (literal)
- Anno
- 2009-01-01T00:00:00+01:00 (literal)
- Http://www.cnr.it/ontology/cnr/pubblicazioni.owl#doi
- 10.1016/j.fusengdes.2009.01.087 (literal)
- Alternative label
Consorzio RFX, Associazione EURATOM-ENEA sulla fusione, corso Stati Uniti 4, 35127 Padova, Italy (2009)
Preliminary design of the control and data acquisition systems for the Neutral Beam Test Facility
in Fusion engineering and design; Elsevier Science SA, Lausanne (Svizzera)
(literal)
- Http://www.cnr.it/ontology/cnr/pubblicazioni.owl#autori
- Consorzio RFX, Associazione EURATOM-ENEA sulla fusione, corso Stati Uniti 4, 35127 Padova, Italy (literal)
- Pagina inizio
- Pagina fine
- Http://www.cnr.it/ontology/cnr/pubblicazioni.owl#url
- http://www.sciencedirect.com/science/article/pii/S0920379606001219 (literal)
- Http://www.cnr.it/ontology/cnr/pubblicazioni.owl#numeroVolume
- Rivista
- Http://www.cnr.it/ontology/cnr/pubblicazioni.owl#note
- Http://www.cnr.it/ontology/cnr/pubblicazioni.owl#pagineTotali
- Note
- Scopu (literal)
- ISI Web of Science (WOS) (literal)
- Http://www.cnr.it/ontology/cnr/pubblicazioni.owl#affiliazioni
- Barana O, Consorzio RFX (literal)
- Titolo
- Preliminary design of the control and data acquisition systems for the Neutral Beam Test Facility (literal)
- Abstract
- The Neutral Beam Test Facility, which will be built in Padova, Italy, is aimed at developing the ITER heating neutral beam injector(HNB) and at testing and optimizing its operation up to nominal performance before installation on ITER. It requires the development of two independent experiments referred to as SPIDER (source for production of ions of deuterium extracted from Rf plasma) and MITICA (megavolt ITer injector & concept advancement). SPIDER will explore the full-size negative ion source for ITER, whereas MITICA will explore the full-size ITER neutral beam injector. Both experiments will be designed for long-pulse operation, up to 3600 s, as ITER itself. MITICA includes three functional components: the heating neutral beam injector plant system (HNB). which is the device under test; the auxiliary plant system (AUX), which includes all equipment to operate the HNB in the test facility (e.g. the local electric grid to feed the HNB power supplies), and MITICA supervisory system that is an electronics/informatics infrastructure to operate the facility. The paper introduces the requirements for the control and data acquisition systems of the experiments and proposes a preliminary design for both systems. SPIDER, which is preparatory to MITICA and will be developed on a shorter time scale, has no constraints coming from ITER CODAC, whereas MITICA includes the ITER neutral beam injector and therefore must be fully compatible with ITER CODAC. (literal)
- Editore
- Prodotto di
- Autore CNR
- Insieme di parole chiave
Incoming links:
- Autore CNR di
- Prodotto
- Http://www.cnr.it/ontology/cnr/pubblicazioni.owl#rivistaDi
- Editore di
- Insieme di parole chiave di