http://www.cnr.it/ontology/cnr/individuo/prodotto/ID244634
Third Periodic Report, 1.10.1999 - 31.3.2000, FUNDAMENTAL BEHAVIOUR OF BFO IN COMBUSTION - EU Contract JOR3-CT97-0253 \"BIO FUEL OIL: Upgrading by Hot Filtration and Novel Physical Methods\" (Rapporti progetti di ricerca)
- Type
- Label
- Third Periodic Report, 1.10.1999 - 31.3.2000, FUNDAMENTAL BEHAVIOUR OF BFO IN COMBUSTION - EU Contract JOR3-CT97-0253 \"BIO FUEL OIL: Upgrading by Hot Filtration and Novel Physical Methods\" (Rapporti progetti di ricerca) (literal)
- Anno
- 2000-01-01T00:00:00+01:00 (literal)
- Alternative label
R. Calabria, J. D'Alessio, M. Lazzaro, P. Massoli, V. Moccia (2000)
Third Periodic Report, 1.10.1999 - 31.3.2000, FUNDAMENTAL BEHAVIOUR OF BFO IN COMBUSTION - EU Contract JOR3-CT97-0253 "BIO FUEL OIL: Upgrading by Hot Filtration and Novel Physical Methods"
(literal)
- Http://www.cnr.it/ontology/cnr/pubblicazioni.owl#autori
- R. Calabria, J. D'Alessio, M. Lazzaro, P. Massoli, V. Moccia (literal)
- Http://www.cnr.it/ontology/cnr/pubblicazioni.owl#altreInformazioni
- Il progetto è stato svolto in collaborazione con: VTT Energy, Helsinki, Schumacher GmbH (Germania), CANMET Energy Technology Center di Ottawa e Fortum Oy (Finlandia) (literal)
- Http://www.cnr.it/ontology/cnr/pubblicazioni.owl#affiliazioni
- Istituto Motori - C.N.R. (literal)
- Titolo
- Third Periodic Report, 1.10.1999 - 31.3.2000, FUNDAMENTAL BEHAVIOUR OF BFO IN COMBUSTION - EU Contract JOR3-CT97-0253 \"BIO FUEL OIL: Upgrading by Hot Filtration and Novel Physical Methods\" (literal)
- Abstract
- In the reference period, the MHP single droplet combustion chamber has been modified to reach a working pressure of 60 bar. By using the modified MHP-SDCC a systematic experimentation has been carried out on pure BFO droplets.
The experimentation was performed as a function of chamber pressure (ranging between 1 and 60 bar) and droplets size (D0 = 425 ?m - 1000 ?m). Increasing the pressure, peculiar differences regarding swelling-microexplosion, vaporization-liquid phase pyrolysis, ignition and cenosphere formation were observed. (literal)
- Il progetto è stato svolto in collaborazione con: VTT Energy, Helsinki, Schumacher GmbH (Germania), CANMET Energy Technology Center di Ottawa e Fortum Oy (Finlandia) (literal)
- Prodotto di
- Autore CNR
- Insieme di parole chiave
Incoming links:
- Prodotto
- Autore CNR di
- Insieme di parole chiave di