Constraint-based Scheduling for Closed-loop Production Control in RMSs (Contributo in atti di convegno)

Type
Label
  • Constraint-based Scheduling for Closed-loop Production Control in RMSs (Contributo in atti di convegno) (literal)
Anno
  • 2012-01-01T00:00:00+01:00 (literal)
Alternative label
  • Carpanzano, Emanuele; Orlandini, Andrea; Valente, Anna; Cesta, Amedeo; Marinò, Fernando; Rasconi, Riccardo (2012)
    Constraint-based Scheduling for Closed-loop Production Control in RMSs
    in 22nd International Conference on Automated Planning and Scheduling. Proceedings of the Scheduling and Planning Application woRKshop, 2012, Atibaia, Sao Paulo, Brazil, 26 June 2012
    (literal)
Http://www.cnr.it/ontology/cnr/pubblicazioni.owl#autori
  • Carpanzano, Emanuele; Orlandini, Andrea; Valente, Anna; Cesta, Amedeo; Marinò, Fernando; Rasconi, Riccardo (literal)
Pagina inizio
  • 17 (literal)
Pagina fine
  • 23 (literal)
Http://www.cnr.it/ontology/cnr/pubblicazioni.owl#altreInformazioni
  • ID_PUMA: /cnr.istc/2012-A2-013. - Progetto: Approcci innovativi e multidisciplinari per ragionamento con vincoli e preferenza - Tecniche a vincoli innovative per problemi di planning e scheduling (literal)
Http://www.cnr.it/ontology/cnr/pubblicazioni.owl#url
  • http://icaps12.poli.usp.br/icaps12/workshops/spark (literal)
Http://www.cnr.it/ontology/cnr/pubblicazioni.owl#pagineTotali
  • 7 (literal)
Http://www.cnr.it/ontology/cnr/pubblicazioni.owl#affiliazioni
  • CNR-ITIA, Milano; CNR-ITIA, Milano; CNR-ITIA, Milano; CNR-ISTC, Roma1-SanMartino; CNR-ISTC, Roma1-SanMartino; CNR-ISTC, Roma1-SanMartino (literal)
Titolo
  • Constraint-based Scheduling for Closed-loop Production Control in RMSs (literal)
Http://www.cnr.it/ontology/cnr/pubblicazioni.owl#curatoriVolume
  • L. C. Vidal, M. Do, R. Rasconi (literal)
Abstract
  • Reconfigurable manufacturing systems (RMS) are conceived to operate in dynamic production contexts often characterized by fluctuations in demand, discovery or invention of new technologies, changes in part geometry, variances in raw material requirements. With specific focus on the RMS production aspects, the scheduling problem implies the capability of developing plans that can be easily and efficiently adjusted and regenerated once a production or system change occurs. The authors present a constraint-based online scheduling controller for RMS whose main advantage is its capability of dynamically interpreting and adapting to production anomalies or system misbehavior by regenerating on-line a new schedule. The performance of the controller has been tested by running a set of closed-loop experiments based on a real-world industrial case study. Results demonstrate that automatically synthesizing plans and recovery actions positively contribute to ensure a higher production rate. (literal)
Prodotto di
Autore CNR
Insieme di parole chiave

Incoming links:


Autore CNR di
Prodotto
Insieme di parole chiave di
data.CNR.it