A multi-criteria class-based job scheduler for large computing farms. (Contributo in atti di convegno)

Type
Label
  • A multi-criteria class-based job scheduler for large computing farms. (Contributo in atti di convegno) (literal)
Anno
  • 2012-01-01T00:00:00+01:00 (literal)
Alternative label
  • Baraglia R., Dazzi P., Ferrini R. (2012)
    A multi-criteria class-based job scheduler for large computing farms.
    in International Conference on Parallel and Distributed Processing Techniques and Applications, Las Vegas, USA, 16-19 July 2012
    (literal)
Http://www.cnr.it/ontology/cnr/pubblicazioni.owl#autori
  • Baraglia R., Dazzi P., Ferrini R. (literal)
Pagina inizio
  • 289 (literal)
Pagina fine
  • 295 (literal)
Http://www.cnr.it/ontology/cnr/pubblicazioni.owl#altreInformazioni
  • Grant agreement 257438 - Tipo Progetto EU_FP7 (literal)
Http://www.cnr.it/ontology/cnr/pubblicazioni.owl#url
  • http://world-comp.org/proc2012/pdpta/contents2.pdf (literal)
Http://www.cnr.it/ontology/cnr/pubblicazioni.owl#pagineTotali
  • 7 (literal)
Note
  • PuMa (literal)
Http://www.cnr.it/ontology/cnr/pubblicazioni.owl#affiliazioni
  • CNR-ISTI, Pisa, Italy; CNR-ISTI, Pisa, Italy; CNR-ISTI, Pisa, Italy; (literal)
Titolo
  • A multi-criteria class-based job scheduler for large computing farms. (literal)
Http://www.cnr.it/ontology/cnr/pubblicazioni.owl#isbn
  • 1-60132-227-5 (literal)
Abstract
  • In this paper we propose a new multi-criteria class-based job scheduler able to dynamically schedule a stream of batch jobs on large-scale computing farms. It is driven by several configuration parameters allowing the scheduler customization with respect to the goals of an installation. The proposed scheduling policies allow to maximize the resource usage and to guarantee the ap- plications QoS requirements. The proposed solution has been evaluated by simulations using different streams of synthetically generated jobs. To analyze the quality of our solution we propose a new methodology to estimate whether at a given time the resources in the system are really sufficient to meet the service level requested by the submitted jobs. Moreover, the proposed solution was also evaluated comparing it with the Backfilling and Flexible backfilling algorithms. Our scheduler demonstrated to be able to carry out good scheduling choices. (literal)
Editore
Prodotto di
Autore CNR
Insieme di parole chiave

Incoming links:


Prodotto
Autore CNR di
Editore di
Insieme di parole chiave di
data.CNR.it