Deliverable 4.1: Planning and definitions of experimental conditions for guided ditching tests. (Rapporti progetti di ricerca)

Type
Label
  • Deliverable 4.1: Planning and definitions of experimental conditions for guided ditching tests. (Rapporti progetti di ricerca) (literal)
Anno
  • 2011-01-01T00:00:00+01:00 (literal)
Alternative label
  • Iafrati, Alessandro (2011)
    Deliverable 4.1: Planning and definitions of experimental conditions for guided ditching tests.
    (literal)
Http://www.cnr.it/ontology/cnr/pubblicazioni.owl#autori
  • Iafrati, Alessandro (literal)
Http://www.cnr.it/ontology/cnr/pubblicazioni.owl#affiliazioni
  • CNR-INSEAN, Roma - Istituto Nazionale per Studi ed Esperienze di Architettura Navale (literal)
Titolo
  • Deliverable 4.1: Planning and definitions of experimental conditions for guided ditching tests. (literal)
Abstract
  • In this section the instrumentation to be used in the INSEAN guided ditching tests is described. The report covers types and positioning of the different kind of sensors/gauges, the main characteristics of the acquisition system as well as other elements of the measurement chain. Some of the components are the same for all the three sets of experiments of Task 4.1, whereas others can vary as specified in the following. (literal)
Prodotto di
Autore CNR
Insieme di parole chiave

Incoming links:


Prodotto
Autore CNR di
Insieme di parole chiave di
data.CNR.it