Distributed Interruptible Load Shedding and Micro-Generator Dispatching to Benefit System Operations (Articolo in rivista)

Type
Label
  • Distributed Interruptible Load Shedding and Micro-Generator Dispatching to Benefit System Operations (Articolo in rivista) (literal)
Anno
  • 2012-01-01T00:00:00+01:00 (literal)
Http://www.cnr.it/ontology/cnr/pubblicazioni.owl#doi
  • 10.1109/TPWRS.2011.2173217 (literal)
Alternative label
  • Argiento, R.; Faranda, R.; Pievatolo, A.; Tironi E. (2012)
    Distributed Interruptible Load Shedding and Micro-Generator Dispatching to Benefit System Operations
    in IEEE transactions on power systems; IEEE - Institute of Electrical and Electronics Engineers, Piscataway, N.J. (Stati Uniti d'America)
    (literal)
Http://www.cnr.it/ontology/cnr/pubblicazioni.owl#autori
  • Argiento, R.; Faranda, R.; Pievatolo, A.; Tironi E. (literal)
Pagina inizio
  • 840 (literal)
Pagina fine
  • 848 (literal)
Http://www.cnr.it/ontology/cnr/pubblicazioni.owl#url
  • http://ieeexplore.ieee.org/stamp/stamp.jsp?tp=&arnumber=6093714 (literal)
Http://www.cnr.it/ontology/cnr/pubblicazioni.owl#numeroVolume
  • 27 (literal)
Rivista
Http://www.cnr.it/ontology/cnr/pubblicazioni.owl#numeroFascicolo
  • 2 (literal)
Note
  • ISI Web of Science (WOS) (literal)
  • Scopu (literal)
Http://www.cnr.it/ontology/cnr/pubblicazioni.owl#affiliazioni
  • IMATI-CNR and Politecnico di Milano (literal)
Titolo
  • Distributed Interruptible Load Shedding and Micro-Generator Dispatching to Benefit System Operations (literal)
Abstract
  • A blackout is the worst end result of a significant difference between generation and absorption of power. Therefore, distribution network operators (DNO) need to know and control the load and generation profiles in advance to run an electric power network well, especially when distributed generation is present, as in the smart grid of the future. The combination of distributed interruptible load shedding and dispatched microgenerators provides the DNO with an interesting opportunity for power network emergency management. In this paper, a proposal to approach this problem and some test results are presented using probabilistic methods for a small lowvoltage network with interruptible loads and combined heat and power (mu CHP) generators. (literal)
Editore
Prodotto di
Autore CNR
Insieme di parole chiave

Incoming links:


Prodotto
Autore CNR di
Http://www.cnr.it/ontology/cnr/pubblicazioni.owl#rivistaDi
Editore di
Insieme di parole chiave di
data.CNR.it