http://www.cnr.it/ontology/cnr/individuo/insiemeDiParoleChiave/96375
Keywords of "Active and Passive 3D survey merging. The case study of the water channel system in Al Habis castle, Jordan."
- Label
- Keywords of "Active and Passive 3D survey merging. The case study of the water channel system in Al Habis castle, Jordan." (literal)
- Parole chiave di "Active and Passive 3D survey merging. The case study of the water channel system in Al Habis castle, Jordan." (literal)
- Insieme di parole chiave di
- Ha membro
Incoming links:
- Insieme di parole chiave
- Membro di